Madhav Infra Projects Ltd
company logo

Madhav Infra Projects Ltd

MADHAVINFRA Share Price

BSE:539894

9.14

-0.03 (-0.33%)

As on April 10, 2026 at 04:00 PM
Loading chart...

Performance

Loading performance...

9.17

8.83

149223

0.14

1

Fundamentals

246.40Cr

8.79

1.06

0.72

1.04

0%

8.63

About

Madhav Infra Projects Limited was incorporated on October 7, 1992. The Company operates in the fields of Highways, Urban Infrastructure, Real Estate and Energy. It is also engaged in power generation business i.e. Solar & Hydro. During the year 2021, the Company implemented various projects through various clients as under: 1) EPC work of Rehabiliation and Upgradation of Road for Civil Package no. 14 via Aaron via Vidoriya, Raghogarh & Ashok Nagar to Aaron Road (up to Sindh Road) 2) EPC work of Rehabiliation and Upgradation of Road for Civil Package no. P2A i.e. Gunj-Rajnagar Road, LaundiMahoba Road, Nawgong-Shrinagar Road, Baxawa - Dalpatpuroad 3) Improvement of Chandur Railway Telegaon Road SH-297 (Section Chandur Railway to Telegaon), 32/200 to KM 49/155, Tal. Chandur Railway, Dist. Amravati. 4) Improvement of Riddhapur Tilwsa Road SH - 300 (Section Riddhapur to Tiwsa) KM 0/000 to KM 40/800, Taluka Morshil & Tiwsa, Dist. Amravati. 5) Design, Engineering, Supply, Construction, Erection, Testing, Commissioning and O&M of 100 MW of Solar Power Generating System ranging from 1 MW to 2 MW at varwus substations/locations in Maharashtra, India. 6) EPC work for Development of Badi- Baktara - Shahganj Road on OMT basis in the state of Madhya Pradesh through SPV viz., Badi Baktara Toll Pvt. Ltd. 7) EPC work for maintenance of High level Bridge over Bina River & Dhasan River with approach Roads on NH-86 at Bhopal- Sanchi- Sagar Road in the State of Madhya Pradesh. 8) Civil Contract of development of Bandri- Jaruwakheda, Nirtala - Mandi- Bamora, Damoh- Hindoriya- Patera, Prithvipur- Niwari, Ajaygarh - Toriya- Bariyapur, and Palera-Baldeogarh in the State of Madhya Pradesh. 9) Supply and Commencing Rooftop Solar Photovoltaic Systems projects of 12 MW in the state of MP, 5 MW projects at various states viz., Gujarat, Rajasthan and Karnataka. 10) Widening and Reconstruction of Madhya Pradesh Major District Roads Up-gradation Project (MPMDRUP) Package No.P-18: Khalwa to Dedatalayi Road (MP-MDR-19-22). 11) Widening and Development of Madhya Pradesh Major District Roads Up-gradation Project (MPMDRUP) Package No. - P - 16: Berasia Narsinghgarh Road (MPMDR- 23-07), Narsingarh Berasia Road (MP-MDR-25-04), Bhojapura Ahmedpura Road (Part 1) (MP-MDR-23-09), Bhojapura Ahmedpura Road (MP-MDR-26-06) and Doraha - Ahmadpur Road (MP-MDR-26-05). 12) Construction of Bridges on State Highways and Major district Road in Bhopal, Madhya Pradesh. 13) Supply, Installation, Testing, Commissioning and Comprehensive AMC of on-grid Solar PV Power Plants at Bhopal BP - 50 KW, Guna BP - 100 KW, Ujjain BP - 80 KW and Raipur BP - 80 KW. 14) EPC of 550 kWp On Grid Roof Mounted Captive Solar Power Project at Gujarat Refinery. During the year 2019, the Company implemented various projects through various clients as under: 1) EPC work for Development of Agar- Sarangpur Road on OMT basis in the state of Madhya Pradesh through SPV viz., Sarangpur Agar Road Pvt. Ltd. 2)EPC work for Development of Khalghat - Manawar Road on OMT basis in the state of Madhya Pradesh through SPV viz. Khalghat Manawar Toll Pvt. Ltd. 3) Civil works for Auditorium Building and Chemical Teal Storage Building also to complete the left over job of Road and other civil structures work including Road, Gate and balance civil work for M/s ONGC Petro Additions Limited at Dahej, Gujarat. 4) Civil and Structural work for various utilities and off sites for revamp and capacity enhancement project at M/s. Bharat Oman Refineries Limited, Bina (MP). In 2023, the Company implemented projects through various clients following Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 35 MW Solar Photovoltaic grid connected power plant at Lakadiya of Bhachau Taluka of Kutchh District around substation of GETCO in the State of Gujarat through Gujarat State Electricity Corporation Limited. Design, Engineering, Supply, Installation, Testing & Commissioning of 15 MW (AC) Solar Photovoltaic Grid-connected Power Plant at ONGC site Vagra, Dist. Bharuch, Gujarat and post warranty Comprehensive Operation & Maintenance through Oil and Natural Gas Corporation of India. Design, Engineering, Procurement & Supply, Construction & Installation, Testing, Commissioning, associated transmission system and Operation & Maintenance for 07 years of 5 MW (AC) solar photovoltaic grid-connected power plant at ONGC, Hazira plant, dist. Surat, Gujarat through Oil and Natural Gas Corporation of India. Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 35 MW Solar Photovoltaic grid connected power plant at Chhatar of Jamnagar District around substation of GETCO in Gujarat through Gujarat State Electricity Corporation Limited; Design, Supply, Installation, Testing, Commissioning, Operation and Maintenance of various capacities Grid connected Rooftop Solar PV Power Project on BOT basis at various WTP sites of MIDC in Maharashtra through the Company; Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 5 MW Solar Photovoltaic grid connected power plant at Songaon of Amravati District around substation of MSETCL in Maharashtra through Energy Efficiency Services Limited. Design, Engineering, Supply & Procurement, Construction, Erection, Testing, Commissioning, Operation and Maintenance of 5 MW Solar Photovoltaic grid connected power plant at Sambhora of Amravati District around substation of MSETCL in Maharashtra through Energy Efficiency Services Limited. In 2024, the Company implemented projects through various clients following the Construction of Railway Over Bridge in liue of LC no. 25 in KM 1050 / 1-2 of Bina - Katni Section between Sagar bus stand to Sadar Bazar Road, Near Dimple Petrol Pump in Sagar City Distt. Sagar (M.P.) Construction of Railway Over Bridge in Lieu of L.C. No. 47 / S.P.L. on Guna - Ashoknagar Road in Distt. Guna (M.P.) Construction of Railway Over Bridge in Lieu of L.C. No.17, On Mugawli - Chanderi Road in Distt. Ashoknagar (M.P.) Construction of Railway Over Bridge in Liue of Level Crossing No. 70 in KM 1141 / 16-18 of Bina-Katni Track on DamohBandakpur Road Distt. Damoh (M.P.) Construction of Elevated Corridor on Raisen-Gairatgang-Rahatgarh Road (Bina Irrigation Project); Construction of Bridges on State Highways and Major District Roads in Madhya Pradesh. Company incorporated a new subsidiary dated April 19, 2025, Rahatgarh Berkhedi Corridor Private Limited as a Special Purpose Vehicle (SPV), for the execution of the Project. In addition, it also acquired shares of MSK Projects (I) Private Limited on April 09, 2025, making MSK Projects a wholly-owned subsidiary. In FY 2025, Company has implemented work of Earthwork & Blanketing between Amjhera (excluding) - Sardarpur (including) section (18.46 KM) in connection with new BG line project between Dahod - Indore of Ratlam Division. A 75 MW Solar Power project in Gujarat and 15 MW Floating Solar Power Project at Chhattisgarh.

1992

NameDesignation
ASHOK MADHAVDAS KHURANAChairman & Non Executive Dir.
Amit A KhuranaED / MD / Promoter
Neelakshi A KhuranaNon-Exec & Non-Independent Dir
Shanker R BhagatIndependent Non Exe. Director
Hiral Vinodbhai PatelNon-Exec & Non-Independent Dir
Nikhil KaushikIndependent Non Exe. Director
Khushbu Prakash PrajapatiCompany Sec. & Compli. Officer

Madhav Infra Projects Ltd FAQs

How do I Buy Madhav Infra Projects Ltd Shares?

close

By opening a demat account and having your KYC papers confirmed online, you may simply purchase Madhav Infra Projects Ltd shares in BlinkX.

What is the Share Price of Madhav Infra Projects Ltd?

close

The share price of any stock is volatile and changes during the day due to a variety of variables. Madhav Infra Projects Ltd's share price is ₹9.14 as of 2026-04-12.

What is the PE ratio of Madhav Infra Projects Ltd?

close

Madhav Infra Projects Ltd's P/E ratio is 8.79 times as of 2026-04-12.

What is the PB ratio of Madhav Infra Projects Ltd?

close

Madhav Infra Projects Ltd's most recent financial reports indicate a price-to-book ratio of 1.06, showing the company's stock market valuation in relation to the value of its real assets.

What is the Market Cap of Madhav Infra Projects Ltd?

close

Market capitalization, often known as market cap, is the market value of all outstanding shares of a publicly listed corporation. Madhav Infra Projects Ltd's market capitalization is ₹246.4 Cr as on 2026-04-12.

What is the ROE of Madhav Infra Projects Ltd?

close

The current financial records of Madhav Infra Projects Ltd show a 13.53% ROE, showing great financial performance and effective capital utilisation, making it a significant statistic for investors.

What is the Total Asset of Madhav Infra Projects Ltd?

close

According to Madhav Infra Projects Ltd's most recent financial filings, the company has a total asset value of ₹429.34, which includes current and non-current assets such as inventory, cash, properties, and equipment.

What is the 52-week high and Low of Madhav Infra Projects Ltd?

close

The 52-week high/low price of a Madhav Infra Projects Ltd stock is the highest and lowest price at which it has traded over that period (about one year) and is used as a technical indicator. Madhav Infra Projects Ltd's 52-week high and low as of 2026-04-12 are ₹16.2 and ₹6.65, respectively.